News & Views

How we made it: The Delft
Transforming Minerva House to become The Delft, we're creating over 50% additional floor area while retaining 75% of the existing structure.

5 minutes with… Ben Brown
Ben shines a light on some of the recent research projects he's worked on in the HTS+ team, and discusses the key drivers in his career to date.
5 minutes with… Emily Exford
Fresh from the hills of Poland, we caught up with Emily to discuss her path into engineering, her work at HTS and her recent pedElle experience.
How we made it: Timber Square
Placing low-carbon materials and sustainable construction methods at its heart, Timber Square is a pioneering net zero carbon redevelopment.

How we made it: The Featherstone Building
A new 5- to 10-storey reinforced concrete office building that showcases the exposed concrete frame within the constraints of the site.
How we made it: 76 Southbank
How we refurbished Denys Lasdun’s iconic Grade II listed design to fit the needs of a contemporary workplace.

5 minutes with… Carmel Lennon
Carmel is a Director and heads up civil engineering at HTS. We spoke to her about her career, how the team has evolved and what they bring to projects.

How we made it: 3 Copper Square
With a hybrid structure of pre-cast concrete frame and CLT panels, 3 Copper Square is the first of its kind in Europe.

How we made it: Victoria House
A Grade II listed building transformed into a life sciences hub with wet-lab, dry-lab, and office spaces spanning multiple levels

5 minutes with… Sophie Davies
We sat down with Sophie to discuss her path into engineering and her role on the BCO NextGen committee, following her trip to PropSki 2024.