News & Views
How we made it: Holborn Viaduct
Our latest in the How we made it series, Associate Director James Mumford and Founder Tom Steel tell us more about how the new Holborn Viaduct was built.
How we made it: Timber Square
Placing low-carbon materials and sustainable construction methods at its heart, Timber Square is a pioneering net-zero carbon redevelopment.
5 minutes with… Sonny Dhand
We spoke to Sonny, our head of Transport and Highways, to find out a bit more about what he and the team's expertise bring to HTS.
How we made it: 4 Arbour Street
With a hybrid structure of pre-cast concrete frame and CLT panels, 3 Copper Square is the first of its kind in Europe.
How we made it: One Exchange Square
One Exchange Square is the refurbishment and extension of a 1980s office building, incorporating reclaimed steel and retaining 94% of the structure.
How we made it: The Delft
Transforming Minerva House to become The Delft, we're creating over 50% additional floor area while retaining 75% of the existing structure.
5 minutes with… Ben Brown
Ben shines a light on some of the recent research projects he's worked on in the HTS+ team, and discusses the key drivers in his career to date.
5 minutes with… Emily Exford
Fresh from the hills of Poland, we caught up with Emily to discuss her path into engineering, her work at HTS and her recent pedElle experience.
How we made it: The Featherstone Building
A new 5- to 10-storey reinforced concrete office building that showcases the exposed concrete frame within the constraints of the site.
How we made it: 76 Southbank
How we refurbished Denys Lasdun’s iconic Grade II listed design to fit the needs of a contemporary workplace.