Blackwall Reach Phase 2
Second phase of redevelopment of Robin Hood Gardens in London’s east, delivering 268 residential units across four buildings measuring up to 10 storeys with a continuous basement.
Key features
Continuous basement designed to minimise excavation
The single-storey basement car park was carefully designed with consideration to the existing substructure to minimise excavation and disposal offsite.
Post-tensioned floor slabs
Providing column-free apartments and minimise foundation requirements, ensuring future flexibility.
New public realm
The new public park and landscaped areas include extensive vegetated swales, which will enhance the sustainable drainage proposals.
SuDS implementation
Blue roofs, permeable paving and rain gardens reduce the attenuation volume by 31% and the volume of below ground attenuation tanks by 640m³.






SuDS implementation - swale