One Twenty King’s Road
A new 5-storey workplace, leisure and retail offer in Chelsea utilising retained basement and lower ground levels from the previous outdated shopping centre.
Key features
Responding to the existing structure
The structural solution is based on a detailed analysis of the existing structural arrangement to minimise structural works required.
New structural elements
The proposed new structure is sat at multiple levels, on strengthened existing foundations and new foundations.
SuDS strategy
Cascading blue roofs attenuate surface water at high level, achieving greenfield run-off rates and avoiding any tank-based solutions or pumping water into the sewer.
Considerate construction on complex site
The site involves occupied buildings and sits above proposed Crossrail 2 tunnels, so structural solutions prioritise constructability and future-proofing.








01-04













