Heyne Tillett Steel Home
Low carbon mode
Project 2903

Mandela Way

A new 4-story stacked urban industrial hub with internal office space for last-mile logistics in Bermondsey – the first of its kind in central London and for our client British Land.

Location London Borough of Southwark
Client British Land
Architect The Harris Partnership
Status On site
GIA 13,000m²
Feature

Key features

Flexible, adaptable space with wide column grid

A 10x10m steel frame column grid with a 5.5m internal height enables flexible, clear space that’s adaptable for a long life.

High design load capacity

Floors designed for loads between 25 and 15kPa to accommodate high storage capacity and vehicle loadings.

20m-clear spans over loading bays

HGV movement routes at ground floor require 20m-clear spans areas to the loading bays created with deep beam transfers.

Ground improvement strategy

Poor quality existing ground conditions were overcome through ground improvements using rigid inclusion piling.

Proposed building, The Harris Partnership