Import Building
A refurbishment of a 1990s office building using an engineered timber structure. The Import Building marks the first phase in the Republic Masterplan and is accompanied by new biodiverse public realm on a former traffic route.
Key features
Refurbishment of 1990s office building
The existing RC frame building has been extended in part with a lightweight steel frame and metal deck, making efficient use of capacity in the retained structure and foundations.
Glulam and CLT exposed atrium structure
A dramatic atrium was created with an exposed glulam and CLT structure, which fixes back to the existing RC slabs.
Archive investigations
After extensive archive investigations on the load-bearing capacity of the existing structure, no additional work to the foundations was required.
Efficient installation and prefabrication
Timber elements were prefabricated according to a module system, which meant they could be installed quickly and efficiently on site.




Key features: public realm
Biophilic design and water features
Weirs and water features were incorporated into the public realm to aerate the water and provide a healthy, natural environment.
Workspaces within the landscape
Flexible outdoor workspaces, including newly planted trees, shrubs and aquatic flora, are nestled throughout the landscaping.







Awards










