Project 2353

Chancery House

Refurbishment and alterations to an existing reinforced concrete and steel-framed 1950s office building above a separate occupied basement domain.

Location City of London
Client The Office Group
Architect dMFK
Status Complete (2023)
GIA 13,935m²
Feature

Key features

Extending the atrium

The existing 1990s steel-framed atrium was extended both horizontally and vertically.

Introducing new lightwells

New lightwells and feature entrances were created to allow more daylight into the development.

Strengthening the existing structure

The existing structure was strengthened to accommodate local changes in use.

Comparing new build with retrofit

HTS completed a study to analyse the embodied carbon of complete demolition and replacement versus retaining the existing building with alterations.

Constructing above an occupied basement

All works were carried out above an occupied separate basement domain.

Awards

2025 RIBA London Awards Won
2024 Dezeen Awards Workplace interior of the year Won
2024 AJ Architecture Award Workplace project (up to £50 million) Won
Photography by Jack Hobhouse, Tom Niven

Project Team