Heyne Tillett Steel Home
Low carbon mode
Project 3098

Bromley-by-Bow Industrial Park

Redevelopment of a light industrial site in East London near Bromley-by-Bow. The scheme will provide a flexible new industrial campus.

Location London Borough of Tower Hamlets
Client Fabrix
Architect Haworth Tompkins
Status In design
Feature

Key features

Ground improvements

Ground improvements will allow shallow spread foundations to be used.

Long-span portal sheds

The warehouses have been designed as long-span portal sheds with internal mezzanines to house office space.

Cut and fill analysis

Completed to inform site levels and reduce excavated / imported materials.

SuDS strategy

The SuDS strategy incorporates permeable paving and rain gardens to attenuate surface water run-off.