Project 1418

60 London Wall

A major refurbishment of a post-modern office building on a 1.3-acre site in the City of London, including a terraced 4-storey extension, additional space at basement level and increased ground floor retail space.

Location City of London
Client CSHV 60 London Wall SARL
Architect EPR Architects
Status Complete (2020)
GIA 29,728m²

Key features

Building area increased by 54%

With 49% of the original structure retained, the refurbished building increased the area by 54% through adding floors and re-coring.

Re-use of piles and frame

Only 10% of existing columns needed to be strengthened, and existing piles were reused and proven with up to 40% additional load. All structure including connections was retrospectively justified

Exposed structures

Both the new and existing structures were exposed, with high-quality structural detailing carried out to reflect this.

Total engineering approach

HTS was responsible for existing, demolition, temporary works and proposed works, with the contract split between structural works and main works to maximise the programme.

BIM Level II

The scheme was executed to BIM level II standards, and HTS worked closely with Skanska to develop exemplary construction and sequencing models.

Photography by Max Brook & G Gardner

Project Team