A 14-story anchor office building in the Brent Cross masterplan with a first-of-its-kind hybrid structure utilising CLT slabs and precast concrete. The structural and civil engineering solutions reduce both the environmental impact and construction programme.
Key features
Groundbreaking hybrid structure
The low carbon hybrid structure is the first of its kind, combining precast concrete beams and columns supporting CLT slabs.
Exposed structure
All structural elements are carefully designed and detailed to be exposed.
Reducing substructure costs
The low building weight brings down the substructure expenditure.
Flexible, long-lasting design life
The structure is designed with flexibility for different use types in mind, connecting floors and buildings for future adaptability.
Total engineering
HTS is delivering both civil and structural engineering, including temporary and permanent works.





Structural embodied carbon
200
kgCO2e/m²
Material Intensity
834
kg/m2