Open/Close Menu
Loading... Loading...

2389 - 3 Sheldon Square

City of Westminster

 

The extensive refurbishment of an existing 1980s steel framed building in Paddington to a high quality, contemporary workplace.

Key Features

  • Lightweight balconies on each floor are supported by Macalloy tension bars hung from a cantilever crown steel frame. Together with the hanging gardens, they create approximately 500 sqm of additional outdoor amenity space and natural shading to office occupants.
  • Discreet structural strengthening to the existing steel frame has been used to allow the balconies to be installed on the edge of the building.
  • Cat A refurbishment throughout.
  • Reimagined statement reception area with new external hanging signage and branding.

 

Client: Architect: Morris + Company

Collect Project Collect

People:
James Morgan
Ben Woodwiss

7134
7135
7137
7138
7203
7204
7205