Open/Close Menu
Loading... Loading...

1416 - 16 Old Bailey

City of London

A complex project that involves the refurbishment of the existing office spaces; compromising the listed building to the front and the steel-framed building to the rear. 

Key Features

  • Two additional floors are being added and the existing atrium infilled to significantly increase floor area, with minimal foundation strengthening works required.
  • New central concrete core being constructed to replace four separate cores, to rationalise floor plates and provide access to new upper levels.
  • Significant works to existing structure to provide additional beam penetrations and localised reduction in structural depth to maximise floor-to-ceiling heights.
  • Temporary and permanent works design undertaken across an enabling works and main works package to ensure an efficient and consistent structural approach.

Client: Nan Fung + developer Endurance LandArchitect: Orms Architects

Collect Project Collect

People:
Mark Tillett

5056
5058
5059
5057
5060
5061
5714
6317
6318