Open/Close Menu
Loading... Loading...

News: 14 March 2017

Tamesis 1 featured in New Steel Construction

It's great to see our project Tamesis 1 featured on New Steel Construction

Commenting on the redevelopment, Project Engineer Szymon Lukas is quoted; "The top floor was always going to be built with steel because it has 15m-long spans, however we redesigned the entire scheme as a steel structure during Stage 3.”

For more information, please follow this link

Collect News Item Collect

3210