
It's great to see our project Tamesis 1 featured on New Steel Construction.
Commenting on the redevelopment, Project Engineer Szymon Lukas is quoted; "The top floor was always going to be built with steel because it has 15m-long spans, however we redesigned the entire scheme as a steel structure during Stage 3.”
For more information, please follow this link.