2300 - Grange St Martins
Camden
Alongside Orms Architects, HTS is working on the redevelopment of the former Central Saint Martin’s site in Holborn. Works include converting the Grade II* listed Lethaby Building to hotel use, a four-storey vertical and lateral extension to an existing 60s tower, three adjoining new-build RC structures and a new deep basement across the majority of the site.
Key Features
- Retention of the existing 60s tower and excavation of a new ~20m deep basement below
- Two new large, below ground, column free event spaces with steel trusses will support new and retained structures above
- Deep underpinning of the Grade II* listed Lethaby Building footings to enable the excavation of the new basement
- Piling adjacent to and construction above a Crossrail tunnel
Client: Grange St MartinsArchitect: Orms